Number of matches: 505
31.
[Latest Update] 327 IAC 2 WATER QUALITY STANDARDS
(PDF)
...
STANDARDS
applied at a point outside of the mixing zone to allow for a reasonable admixture of waste effluents with the
receiving waters.
(b) Due to varying physical, chemical, and biological
...
32.
[2023] 327 IAC 2 Water Quality Standards
(PDF)
...
. 3.1. (a) The combined sewer overflow (CSO) wet weather limited use subcategory established under section 3 of this
rule applies only to
waters receiving wet weather discharges from combined
...
33.
[2015] 327 IAC 5 Industrial Wastewater Pretreatment Programs and Npdes
(PDF)
...
receiving waters;
(3) presence of toxic pollutants in the discharge; and
(4) compliance history of the discharger.
(Water Pollution Control Division; 327 IAC 5-1.5-30; filed Jan 14, 1997, 12:00
...
34.
[2014] 327 IAC 5 Industrial Wastewater Pretreatment Programs and Npdes
(PDF)
...
receiving waters;
(3) presence of toxic pollutants in the discharge; and
(4) compliance history of the discharger.
(Water Pollution Control Division; 327 IAC 5-1.5-30; filed Jan 14, 1997, 12:00
...
35.
[2015] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
quality; or
(2) in
receiving waters that do not require a TMDL study, an equivalent analysis demonstrates water quality is not threatened
by storm water discharges, and it has been determined that
...
36.
[2014] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
are not needed to protect water quality; or
(2) in
receiving waters that do not require a TMDL study, an equivalent analysis demonstrates water quality is not threatened
by storm water
...
37.
[2013] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
construction site discharges are not needed to protect water quality; or
(2) in
receiving waters that do not require a TMDL study, an equivalent analysis demonstrates water quality is not threatened
...
38.
[2021] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
; or
(2) in
receiving waters that do not require a TMDL study, an equivalent analysis demonstrates water quality is not threatened
by storm water discharges, and it has been determined that
...
39.
[2020] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
; or
(2) in
receiving waters that do not require a TMDL study, an equivalent analysis demonstrates water quality is not threatened
by storm water discharges, and it has been determined that
...
40.
[2019] 327 IAC 15 Npdes General Permit Rule Program
(PDF)
...
discharges associated with
construction activity indicates that controls on construction site discharges are not needed to protect water quality; or
(2) in
receiving waters that do not require a TMDL
...
Previous Page
Next Page
Number of matches: 505
Search completed in 0.124 seconds.