11.
[2014] 105 IAC 11 Prequalification of Contractors and Bidding
(PDF) ...
later than twenty-one (21) calendar days prior to the bid opening date to receive consideration for that bid opening.
A statement from a contractor for prequalification renewal must be received ...
17.
[2008] 105 IAC 11 Prequalification of Contractors and Bidding
(PDF) ...
later than twenty-one (21) calendar days prior to the bid opening date to receive consideration for that bid opening.
A statement from a contractor for prequalification renewal must be received ...
19.
[2023] 105 IAC 11 Prequalification of Contractors and Bidding
(PDF) ...
consideration for that bid opening.
A statement from a contractor for prequalification renewal must be received at least fifteen (15) calendar days prior to the bid opening
date to receive consideration ...
20.
[Latest Update] 80 IAC 8 PROCUREMENT OF SERVICES AND SUPPLIES
(PDF) ...
purpose.
(ii) Any requirement imposed under section 11 of this rule.
(D) The time, date, and place for the opening of bids.
(E) A statement concerning whether the bid must be accompanied by a ...