Number of matches: 2391
1.
[2011] 312 IAC 11 Public Freshwater Lakes
(PDF)
...
rule. In making the
determination, there shall be a determination that issuance of the permit would not result in
significant environmental harm
to the public freshwater lake.
(2) The applicant
...
2.
[2008] 312 IAC 11 Lake Construction Activities
(PDF)
...
conditions attached to the license, conforms with IC 14-26-2 and this
rule. In making the
determination, there shall be a determination that issuance of the permit would not result in
significant ...
3.
[2010] 312 IAC 11 Lake Construction Activities
(PDF)
...
seawall within
or along the shoreline or water line of a public freshwater lake.
(b) If a
new seawall is to be placed:
(1) in a
significant wetland; or
(2) along a natural shoreline;
the
...
4.
[2009] 312 IAC 11 Lake Construction Activities
(PDF)
...
, conforms with IC 14-26-2 and this
rule. In making the
determination, there shall be a determination that issuance of the permit would not result in
significant environmental harm
to the public
...
5.
[2010] 326 IAC 2 Permit Review Rules
(PDF)
...
date of this
rule.
(9) "
New portable source" means any portable operation that has not commenced construction as of the effective date of this
rule or does not have a valid operating permit as
...
6.
[2009] 326 IAC 2 Permit Review Rules
(PDF)
...
date of this
rule.
(9) "
New portable source" means any portable operation that has not commenced construction as of the effective date of this
rule or does not have a valid operating permit as
...
7.
[2008] 326 IAC 2 Permit Review Rules
(PDF)
...
rule.
(9) "
New portable source" means any portable operation that has not commenced construction as of the effective date of this
rule or does not have a valid operating permit as of the
...
8.
[2007] 326 IAC 2 Permit Review Rules
(PDF)
...
emissions unit for which construction commences on or after the effective date of this
rule.
(9) ?
New portable source? means any portable operation that has not commenced construction as of the
...
9.
[2006] 326 IAC 2 Permit Review Rules
(PDF)
...
construction commences on or after the effective date of this
rule.
(9) ?
New portable source? means any portable operation that has not commenced construction as of the effective date of this
rule or
...
10.
...
(PDF)
...
Provisions
Rule 2. Prevention of
Significant Deterioration (PSD) Requirements
Rule 2.2. Clean Unit Designations in Attainment Areas (Repealed)
Rule 2.3. Pollution Control Project Exclusion Procedural
...
Next Page
Number of matches: 2391
Search completed in 0.139 seconds.